Full line pipe relining 1 day on site

The fig root line, ended.

Epping. 12m of 1960s earthenware under a fig canopy, root invaded at three joints. Relined in a day, lawn untouched, proven on camera.

Project
112
Completed
May 2026
Build time
1 day
Footprint
12m run, 1.8m deep
CCTV still before relining: fig roots entering a cracked earthenware joint Before
CCTV still after relining: one seamless cured liner bore After
The fig root line, ended, Epping. 12m of 1960s earthenware under a fig canopy, root invaded at three joints. Relined in a day, lawn untouched, proven on camera.

The job

What we walked into, and what we did.

The problem

A slow drain every winter, jetted three years running, and a fig tree nobody would dream of removing. The CCTV survey found root intrusion at three joints across a 12 metre earthenware run, 1.8m under an established lawn.

Our approach

Jetted the roots and scale out at high pressure, then inverted a resin saturated structural liner through the existing inspection opening and cured it in place. Two branch junctions robotically reinstated and sealed. Post cure camera pass the same afternoon.

The result

One seamless pipe inside the old one, the fig still standing, the lawn never opened. The homeowner keeps the before and after footage and a 50 year liner warranty in writing. Priced off the rate card at $9,200 ex GST, agreed before work started.

Materials

  • Structural cured in place liner, 100mm bore
  • Robotic junction reinstatement, two branches
  • Post cure CCTV proof pass, footage handed over

Named in writing

Materials and the honest number.

Line 100mm earthenware house sewer, 12m Mapped and measured on the pre works CCTV survey
Liner Structural cured in place liner A new pipe formed inside the old one, not a coating
Junctions 2, robotically reinstated $650 each on the rate card, counted on camera first
Proof Post cure CCTV pass Footage handed over with the written 50 year warranty
What this job cost
$9,200
ex GST, quoted from the published rate card before work started
Setup, 100mm reline$2,500
Structural liner, 12m x $450$5,400
Junction reinstatements, 2 x $650$1,300
Price a project like this

1 day on site

How the job ran.

  1. Survey

    Camera down, faults mapped

    CCTV crawler logged root intrusion at 4.1m, 6.2m and 9.8m. Footage reviewed with the owner, quote built from the rate card the same day.

  2. Day 1 am

    Clean and line

    High pressure jetting cut the roots out; the liner was inverted through the inspection opening and left to cure.

  3. Day 1 pm

    Junctions and proof

    Both branch connections robotically reopened and sealed, then the post cure camera pass end to end. Drains back in service that evening.

On site

A closer look.

“Three winters of blocked drains, gone in a day, and the fig tree never knew they were here. Watching the after footage was the most satisfying thing I have seen all year.”
Peter and June H. (demo) · Epping
Get started

Start with a measured quote, not a brochure.

Tell us what you need. We’ll book a walkthrough and send a quote with the work itemised, not just a number.